lusTawng

Inhmelhriattirna

 

 

Kan multi‐section steel pole te hi installation rang tak, structural strength sang tak, leh hun rei tak chhunga pawn lama rintlakna atana siam a ni. An hman nasa hle a: -.High Mast Lighting System hmanga siam a ni - Telecommunication Tower / Signal Pole te a awm bawk - Power Transmission & Distribution Poles te a awm bawk - Airport / Port / Stadium chhunga hmanraw tangkai tak tak te

 
 
Installation hmaa enfiahna tur

Hmanrua

  • Crane emaw, lifting hmanrua emaw hmangin
  • Wrench / socket hmanrua te a awm bawk
  • Level meter a ni
  • Lifting straps a awm bawk
  • Bolt, nut, washer te chu pole nen pek a ni

Sahimna

  • PPE (helmet, kutkawr, safety boots) bun tur a ni.
  • Foundation chu a dam kim tawh tih enfiah rawh
  • Lifting lai hian hnathawhna hmun chu thianghlim takin dah tur a ni

 

 
Step‐by‐Step Installation kalpui dan tur
 
01/

Step 1: Foundation enfiahna tur

  • Anchor bolt layout leh verticality chu nemnghet rawh.
  • Bolt thread zawng zawng chu tifai vek rawh.
02/

Step 2: Section Inkhawmpui neih dan tur

  • Pole section te chu leiah dah rawh.
  • A chunglam section chu a hnuai lam expansion joint nen align rawh.
  • Section hrang hrangte chu a thut kim thlengin nawr/slide rawh.
  • Internal locking bolt (a hman theih chuan) kha khauh takin khih rawh.
03/

Step 3: Pole chu chawi sang rawh

  • Lifting strap te chu lifting point chhinchhiahna hmunah fix rawh.
  • Twisting awm loh nan zawi zawiin chawi sang rawh.
  • Ground team hian kaihhruaina kawngah an pui thin.
04/

Step 4: Anchor Bolt-a dah tur

  • Fimkhur takin pole chu bolt template chungah dah thla rawh.
  • Washer leh nut te dah la.
  • Verticality chu level pakhat hmangin siamrem rawh.
  • Pressure inang tlang tak neih theih nan crosswise-in khauh takin khih rawh.
05/

Step 5: Top‐Head-a dah dan tur

Pole chi hrang hrang a zirin: -Mast sang tak:head frame, winch system, leh luminaire ring te dah rawh. -.Telecom-a inbiak pawhna:antenna, bracket, leh cable tray te dahna. -.Power Pole: 1000 a ni.cross arm, insulator, leh cable hardware te siamthat.

06/

Step 6: A tawp bera enfiahna

  • Vertical alignment a awm tih finfiah rawh.
  • Bolt zawng zawng kha a khauh vek tih finfiah rawh.
  • Cable routing leh safety enfiah rawh.
 

Enkawlna (A tha ber) .

 
 

Kum tin bolt tihkhauh dan enfiah thin

Corrosion emaw paint chhia emaw enfiah rawh

Accessories leh wiring te enfiah thin ang che

 

Marketing Script tawi tak a ni

"Kan high‐strength steel pole te hi assembly rang tak, hun rei tak chhunga rintlak, leh multi‐industry application atana engineered a ni. Mast lighting sang atanga telecom leh power distribution thlengin, pole tin hi him taka lifting, secure section connection, leh outstanding outdoor durability atana duan a ni. Installation process chiang tak leh precision‐built components te nen, kan pole solutions hian customer te chu installation tihtlem nan a pui a ni." hun hman dan tur leh kum tam tak chhung chu performance nghet tak neih theihna tur a ni."